info@aztec.us
602 454 0402
Home
About Us
Leadership
TYPSA Group
News, Awards & Rankings
Markets
Projects
Careers
Contact Us
Home
About Us
Leadership
TYPSA Group
News, Awards & Rankings
Markets
Projects
Careers
Contact Us
Home
About Us
Leadership
TYPSA Group
News, Awards & Rankings
Markets
Projects
Careers
Contact Us
Projects
Home
Projects
Show All
Energy
Environmental/Landscape
Field Services
Rail/Transit
Special
Transportation
Summer and Winter Wheat
Energy
Townsite Solar Power Plant
Energy
Beacon Solar Power Plant
Energy
Crosscut Canal Path and Bridge
Transportation
3rd and 5th Avenues Roadway Modernization
Transportation
I-15 Express Lanes Project Design-Build
Transportation
Peoria Veterans Memorial Expansion
Environmental/Landscape
Hoover Dam Bypass Field Services
Field Services
South Mountain Freeway PPP
Transportation
Mount Signal Solar Plant
Energy
Riyadh Metro Project Lines 4, 5, and 6
Rail/Transit
Mount Signal Solar Plant Survey Services
Field Services
Advanced Guideway System (AGS) Feasibility Study
Rail/Transit
I-10/SR303L System Interchange, Phase I & II
Transportation
Doha Metro Red Line
Rail/Transit
I-595 (PPP)
Transportation
I-10, SR101L to I-17 Field Survey
Field Services
US 181 Harbor Bridge Design-Build
Transportation
US60 (Grand Avenue), 71st Avenue to McDowell Road Field Services
Field Services
High Speed Link between Chamartin and Atocha Stations
Rail/Transit
I-69 Section 5 (PPP)
Transportation
Yuma Area Service Highway Field Survey
Field Services
Figueras-Perpignan High-Speed Line
Rail/Transit
Central Phoenix/East Valley Light Rail Transit
Rail/Transit
Red Mountain Freeway (SR202L), SR101L to Broadway Road Design-Build
Transportation
On-Call Right-of-Way Plans, Surveys & Legal Descriptions
Field Services
Lone Valley Solar Plants I & II
Energy
PHX Sky Train® Utility Designation and Locating Services
Field Services
Colorado Portfolio A, B, & C Community Solar Gardens
Energy
Santan Freeway (SR202L), I-10 to Gilbert Road HOV Lanes Design-Build
Transportation
PHX Sky Train®
Rail/Transit
CityScape Vacuum Excavation and Designating Services
Field Services
US89 Interim Detour (US89T)
Transportation
Central Phoenix/East Valley Light Rail Transit Utility Designating Services
Field Services
Pasadena Blue Line Design-Build
Rail/Transit
Statewide Services for Existing Utility Locating
Field Services
Environmental Services & Statewide Environmental Investigations On-Call Contract
Environmental/Landscape
SR202L/US60 “SuperRedTan” Interchange
Transportation
On-Call SUE Services Job Order Contract
Field Services
Los Angeles to Pasadena Gold Line, Light Rail Design-Build
Rail/Transit
Tramandai Wind Farm
Energy
Black Mountain Boulevard Environmental Assessment
Environmental/Landscape
Coahuila Wind Farm
Energy
Environmental Compliance for the Interim Detour of US89
Environmental/Landscape
Avenida Rio Salado/Broadway Road
Transportation
Denver Utility Locating Services On-Call
Field Services
Design and Construction Supervision for Pestera & Cernavoda Wind Farms
Energy
Avenida Rio Salado/Broadway Road Environmental Assessment
Environmental/Landscape
Davis Dam Substation to Mead Substation 230-kV Transmission Line Reconductor Biological and Cultural Monitoring
Environmental/Landscape
Higley, Recker and Williams Field Road Improvements
Transportation
Miscellaneous Services – Subsurface Utility Engineering
Field Services
SR303L, Happy Valley Parkway to Lake Pleasant Parkway
Transportation
SR260 Wildlife Fencing
Environmental/Landscape
Deer Valley Road, 7th Street to Cave Creek Road
Transportation
Underground Utility Potholing and Ancillary Services On-Call
Field Services
Nogales Mariposa POE Environmental Assessment
Environmental/Landscape
Loop 303 Outfall Drainage System Design
Transportation
Downtown Storm Drain Improvements – Jefferson Street, 19th Avenue to 3rd Avenue
Field Services
SR24, Williams Gateway Freeway
Environmental/Landscape
Engineering/Consulting Annual Services Contracts
Transportation
Queen Creek Road Reclaimed Water Main Design Utility Locating Services
Field Services
Tonopah Desert Recharge
Environmental/Landscape
West Chandler/Santan Freeway Wastewater Force Main
Transportation
On-Call Subsurface Utility Excavation Services
Field Services
12” Water Main in Broadway Road
Transportation
Parker-Planet TAP 69-kV Transmission Line Rebuild, Up-Grade & Right-of-Way Action
Environmental/Landscape
Avenida Rio Salado, 35th Avenue to 15th Avenue
Transportation
Salt River Tempe Reach Low Flow Channel
Environmental/Landscape
Williams Field Road 16” Waterline from Greenfield Road to UPRR
Transportation
San Diego Padres/Seattle Mariners Clubhouse Renovations
Environmental/Landscape
Ocotillo Road from Higley Road to Recker Road
Transportation
P83 Entertainment District
Environmental/Landscape
Black Mountain Boulevard, SR51/SR101L Interchange to Cave Creek Road
Transportation
US 60 Show Low Multi-Use Path
Environmental/Landscape
El Mirage YMCA Recreational Center
Environmental/Landscape
Western Canal Multi-Use Path Improvements
Environmental/Landscape
Flood Control On-Call Services
Special
Communications Cable Replacement Phase 3 & 4
Special
Casino Sanitary Sewer Line Extension Improvements
Special