TXDOT/FLATIRON/DRAGADOS
Corpus Christi, TX
Transportation: Highways
AZTEC is providing traffic and structures design support for this major bridge replacement project. Our responsibilities include the plan development of signing and striping, traffic signals, and noise walls. This fast-track project involves the development, design, construction and maintenance of 6.44 miles of freeway in addition to approach roadways.