Confidential Client
Fresno County, CA
Energy – Solar
• 22 MW
• 30% Basic design
• EPC Contract Exhibits (Technical)
• Engineering Review Process
• Construction Management
• On-Site QAQC Supervision
• Commissioning + Performance Testing
Energy – Solar
• 22 MW
• 30% Basic design
• EPC Contract Exhibits (Technical)
• Engineering Review Process
• Construction Management
• On-Site QAQC Supervision
• Commissioning + Performance Testing
©2024 AZTEC Engineering Group, Inc.