City of Phoenix
Phoenix, AZ
Transportation – Municipal
For multiple years now, AZTEC has partnered with the City of Phoenix under its annual engineering/consulting services contract to deliver on a range of different task orders. These projects were coordinated with several different City Departments including Street Transportation, Water Services Department, Planning and Parks & Recreation, and others. Highlights of projects completed under this contract include:
- Drainage improvements at Mountain View Road from 3rd Street to 7th Street
- Drainage, sidewalk, and trail improvements along 48th Street from Indian School Road to Calle Redonda
- Preparation of a design concept report (DCR) and specifications for the Citywide Alley Dust Proofing projects
- Preliminary design of sidewalk improvements along 44th Street from Knox to Warner Elliot Loop Road and Cheyenne Drive from 48th Street to 51st Street
- Preliminary engineering for Sonoran Desert Drive from I-17 to North Valley Parkway
- Final revisions for 64th Street and Mayo Boulevard
- Design for Broadway Road Watermain from 35th to 31st Avenue
- Final design for Tempe Reach Salt River Low Flow Channel
- Signing for Dove Valley Road
- Design for Broadway Road Sanitary Sewer Improvement District