Pasadena Blue Line Construction Authority
Los Angeles County, CA
Rail/Transit – Transit
This project was a design-build for a 15-mile right rail line between downtown Los Angeles and Pasadena. Project responsibilities included track alignment for the project limits, configuration of the “Colorado Box” through Old Town Pasadena, and design of the trackbed and street improvements for the Marmion Street Corridor.