AES Solar
Imperial Valley, CA

Field Services – Survey

The Mount Signal Solar Plant covers approximately six square miles of agricultural land that was developed for photovoltaic solar power generation. AZTEC performed all surveying duties for the project, which included aerial mapping supplemented with ground surveys of the existing conditions. AZTEC performed the boundary survey for the project including development of the ALTA survey and submittal of a Record of Survey Map. In addition, we assisted the client in the review of EPC bid documents and development of permitting exhibits and documentation.